A horizontal fence shows every mistake: a slat a sixteenth out of line catches the eye from across the yard. So we lay these out with you on site, build one sample bay first so you can see the gap and the colour, and only then build the rest.
Posts go every six feet, steel or cedar, set in concrete and dead plumb. The slats are spaced with jigs, fixed with hidden stainless screws, and oiled once they’re up. A matching gate is hung on heavy hinges so it never drops out of line with the run.
Questions about fences, gates, prices and the towns we cover
Hi! Ask me what Bramwell builds, what a cedar or vinyl fence usually costs per foot, how soon a crew can start or which towns we cover. For an exact price, a free estimate is the way: call (503) 555-0174.
The AI chat is not connected on this site yet.
It runs on your own AI key: add ANTHROPIC_API_KEY (Claude) or OPENAI_API_KEY (OpenAI) to your site's environment and redeploy. No key is included with the template, and this demo does not provide one.